Delhi–Meerut Regional Rapid Transit System

Under-construction and partially operational regional transit system in India

The Delhi–Meerut Regional Rapid Transit System is a partially operational 82.15 km (51.05 mi)-long semi high-speed rail and regional transit corridor that will connect the National Capital Region (NCR) cities of Delhi, Ghaziabad and Meerut. It is the first of the four rapid rail corridors planned under the first phase of the RapidX project managed by the National Capital Region Transport Corporation (NCRTC). Designed to allow a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of 30,274 crore (US$3.6 billion). It will start from Jangpura as the starting station, run through Sarai Kale Khan, the terminal for the three planned corridors, both in Delhi, and end in Modipuram in Meerut. It will have 16 stations and two depots at Duhai and Modipuram.

Delhi–Meerut Regional Rapid Transit System News and Videos   LIVE

ℹ️ This is a LIVE page which updates automatically as we're monitoring our hand-curated selection of verified and trustworthy media outlets

You might like